An amendment to Local Law 152 of 2016 allows building owners to receive a 180-day extension of the due date for the inspection of the building’s gas piping system and submission of the GPS2: Gas Piping System Periodic Inspection Certification form to the Department of Buildings. See Local Law 138 of 2021.